Our procedures to get your plunge pools installed

Delivery

Frame 552

In most cases the pool can be rolled / carried into position.

Frame 552

Our service provides two crew to assist in getting pool into position

Frame 552

For difficult sites we will request you to provide able bodies persons to assist

Frame 552

If a crane is required we will assist with strapping and slings. Crane at owners cost

Frame 552

The height of the pool is the width when rolling so use this measurement to check access

Pool Base

Frame 552

Pool requires a minimum 100mm thick concrete slab

Frame 552

Imperfections in slab will show in floor of pool

Frame 552

Slab to be prepared before pool arrival

Frame 552

Base failure voids warranty

Compliance

Frame 552

Check with your local council regarding approvals required

Frame 552

Will require pool fencing to Australian standard AS1926.1

Frame 552

Generally a DA or complying development is required

Frame 552

Owners responsibility and cost for this aspect of the project

Get an instant quote with our virtual pool builder

Scroll to Top